MMK A.Ş. BOTAŞ 36" 21.000m BOTAŞ Hatay Natural Gas Pipe Line complete construction work
MMK, TERMİŞ A.Ş. Tarsus – Mersin Natural gas connection line construction project 4"-16" 23.000m
SAN-İŞ İNŞAAT A.Ş. BOTAŞ Antalya Natural gas pipe line 36" 40.000m mechanical work
AD A.Ş. BOTAŞ between Aliağa Pig station - ENKA RMS-A, 8 km, 20'' High pressure pipe line complete construction
BOTAŞ CS-5 ESKİŞEHİR Installation of the compressor station further Cyclone Filter
BOTAŞ ERZURUM HORASAN 8" boru hattı Aras river crossing construction
BOTAŞ A.Ş. DOĞU BEYAZIT repair of exploded High pressure pipe line
BOTAŞ A.Ş. KARS 8" hot-tap welding
BOTAŞ A.Ş. Kırklareli CS-1 compressor station 36" loop line connection
KALE ENERJİ A.Ş.
BOTAŞ type19 pcs 5000 m3/h- 150.000m3/h natural gas RMS-A (pressure reduction and measurement station) Welding and Mechanical Assembly
BOTAŞ, İGDAŞ, PALGAZ and ZORLU ENERJİ type of different capacity (200m3/h - 15.000m3/h) Natural Gas RMS-B, RMS-C type station welding and Mechanical Assembly
MOSB ,Eksen İnşaat First step Natural gas Steel and polyethylene Infrastructure Project
9 pcs line valve (16", 12", 10", 8", 6") manufacturing and mechanical assembly
PETKİM A.Ş
TOKAR A.Ş., PETKİM, connection Between RMS-A and 40 MW gas turbins, 14" Natural gas pipe line and Natural Gas transformation project.
KALE ENERJİ A.Ş. PETKİM, 200.000m3/h capacity natural gas RMS-A welding and Mechanical Assembly
PALMET A.Ş
Various capacity Natural gas RMS-A, RMS-B, RMS-C station welding and mechanical assembly
İNGAZ A.Ş.
İNGAZ 50.000 m3/h RMS-A Welding and Mechanical assembly
Yenişehir ŞİŞECAM factory 3.000m 8" high pressure natural gas complete construction work
İngaz A.Ş. 8" 6.000m medium pressure Natural gas pipe line construction
ZORLU ENERJİ A.Ş.
SAN-İŞ İnşaat A.Ş. Edirne Natural Gas various diameter construction work
TEKŞEM A.Ş. ÇERKEZKÖY.
Factory complete Natural gas transformation work